By Mitch Haustein on Sunday, 16 June 2024
Category: Water Quality

Rum Riverbank Stabilization Projects - How are Things Looking?

ACD staff recently boated the Rum River to review potential riverbank stabilization and in-stream habitat sites, which provided an opportunity to assess a few previously installed stabilization projects. Each site was stabilized with hard armoring at the bottom of the slope (where vegetation will not grow due to frequent water level fluctuation) and native vegetation on the upper banks. The sites have remained stable, and vegetation has established to provide riparian habitat value within the Rum River Corridor.

 For more information contact Mitch Haustein, Shoreline and Stormwater Specialist, at This email address is being protected from spambots. You need JavaScript enabled to view it..

Related Posts